Water main, sewer outlet, sinks and toilets — automatic pipe runs, X-ray view and plumbing PDFs.

Plumbing is derived, not drawn. Place a Water Main, a Sewer Outlet and your sinks and toilets — every supply and drain pipe is routed for you, shown in X-ray, priced into a schedule and drawn on the plumbing PDF. Move a fixture and its pipes follow.

Components#

ComponentRolePipes
Water MainSupply entry and stop valve — one per plan.Feeds every fixture.
Sewer OutletInspection chamber at ground level — one per plan.Every drain ends here.
SinkKitchen sink or basin.Ø15 mm cold supply · Ø40 mm waste.
ToiletWC with cistern.Ø15 mm cold supply · Ø100 mm soil pipe.

Plumbing Mode#

  1. Click 💧 in the bottom toolbar

    A palette appears and the house turns X-ray, with every pipe run drawn.

  2. Place items

    Pick Water Main, Sewer Outlet, Sink or Toilet and click a floor. Clicks pass through the see-through walls and roof to the nearest floor — the ground, a floor slab, or an upper storey. Put the Water Main and Sewer Outlet outside the house.

  3. Adjust

    Each placed item is selected, so you can move or rotate it and edit its size in the sidebar. The pipes redraw as you go.

ColourMeaning
BlueCold-water supply from the Water Main (runs 0.3 m below the slab).
BrownDrains to the Sewer Outlet (0.6 m below the slab) — thicker for Ø100 soil pipes.

Each pipe drops straight down from its fixture to below the ground slab, runs across in an L, and rises (supply) or ends (drain) at the other end. Upper-floor fixtures drop through a stack directly below them.

Tip
DreamCode does this for you: any house with a sink or toilet gets a Water Main outside its west wall and a Sewer Outlet outside its east side.

Plumbing diagram PDF#

File → Export → PDF (Plumbing Diagram), or the 💧 droplet button on a plan in your Projects page:

  • Schematic — water supply (Water Main → fixtures) and drainage (fixtures → Sewer Outlet) ladders with pipe sizes.
  • Plumbing layout — the ground floor with every fixture, supply runs in blue and drains dashed in brown. Fixtures stacked on different floors share a symbol (e.g. WC1 / WC2).
  • Schedule — every fixture (SK1, WC1…) with its level, pipe sizes and run lengths; pipe quantities by size; installation notes.
Heads up
This is a reference design: one pipe per fixture, cold water only, and drain falls are noted (1:40 for Ø40, 1:80 for Ø100) rather than modelled. A licensed plumber must confirm sizes and routes against local codes.